Logo Loading

Tags: new house extension

  • Tag:
Brickwork in footing

New build extension in Pontefract

We recently completed another extension in Pontefract for a builder who is local to the area.  A straight forward build that took us 8 days. We were a little hampered with the weather and delivery times but still got the brickwork finished quite quickly and to a good standard.

Double story extension in Dore, Sheffield

We took this job on for a friend of our's who has taken on the full package of renovating the house. The build consists of a large kitchen extension at the rear that reduces on the second floor to just the side and wraps around the rear to match the front which will be near symmetrical with a lower roof in the middle.